Dongah Geological Engineering Co. Ltd
We have supplies specialized manpower services for the Micro Tunneling Project for the Muharraq Sewerage Project to M/s Dongah Geological Engineeri
WTE Wassertechnik GmbH
We are providing Highly Qualified managing staff and highly skilled technical staff for the operation, maintenance of the rapid gravity filters pla
WTE Wassertechnik GmbH
The scope of work comprised of design, build and operation of the new Filtration plant. This includes the following:
Jalal Al Aali and Sons Co
Fitting a new scum removal system with a new screw conveying system, Collection/ discharge System, Replacement of all Pipes, Accessories and Suppor
Sayed Kadhem Al Durazi & Sons Bsc (C)
Supplied installed and commissioned a flap valve of the sea out fall for the storm water lift station and sea outfall Project Zallaq Block 1057 Pro
Lidya Yapı San ve Tic. A.Ş.
Upgrading of onsite TSE distribution system was consisted of installation of 100 mm Dia. UPVC pipe line and installed two booster pumps and a press
work now with seniors
work now with seniors
work now with seniors
work now with seniors